Automatic Coolant Mixing Refill System (Smart Flow System)
Case Studies
The customer is an expert in automated production lines, equipping a large number
of machines. It's very time-consuming to replenish the cutting fluid every day,
requiring employees to manually operate. Each machine needs to be replenished
with cutting fluid 2-3 times a day, with 1-2 barrels of 5-gallon cutting fluid added
each time. This process takes a considerable amount of time, around 2 minutes per
machine. The cutting fluid automatic mixing and replenishment system from HC Feng
is the perfect solution. Once installed with the inlet and outlet pipes, it efficiently
filters the water through three filter cores before mixing it to the desired
concentration using an Italian mixing pump. The mixed cutting fluid is then stored in
our mixing tank. Each function is equipped with separate display switches, and we've
installed liquid-level detection sensors on the oil drums to ensure there is sufficient
original fluid. After positioning the machine, we have two options for replenishing
water. The first is manual replenishment, and the second involves directly
connecting the water pipe to our machine. Once the water pipe is connected, our
magnetic pressure motor continuously supplies water to the pipe. For this project,
the customer opted for manual valve replenishment, which is very convenient to
operate. Simply open the water valve switch, and the machine's motor will deliver
water to your machine. Close it once the water level in your tank is sufficient. It is
very convenient and efficient for processing plants with a large number of machines.
No Matched Results